Solar Installation in Midrand, Gauteng
Midrand grew faster than its grid. City Power runs most of it from the Midrand service centre, but key transformers belong to Eskom, and some suburbs buy straight from Eskom. We install solar and battery systems for Midrand homes and estates and handle whichever approval route applies to your property. Erazon Solar handles solar installation in Midrand for hybrid solar, battery backup and upgrades, with the electrical CoC included.
Supplied by City Power or directly by Eskom depending on your property: City Power needs SSEG approval before you install.

How much does solar cost in Midrand?
The same published prices apply in Midrand as everywhere we work. Your final price depends on the size your home needs, which we confirm at the assessment.
Solar installation in Midrand: what is different here
Why does Midrand have so many planned outages?
City Power has said Midrand's rapid development has overloaded some of its substations (Gauteng.net), so maintenance shutdowns are frequent. In 2026 alone it scheduled full-day interruptions at the New Road substation and Randjespark switching station in April (The Citizen, Apr 2026) and at the Beaulieu and Longmeadow switching stations in July (TimesLIVE, Jul 2026). A 9am to 5pm shutdown is exactly what a solar system with a battery covers.
Is Midrand power supplied by City Power or Eskom?
Both, depending on where you are. Rabie Ridge, Mayibuye and Austin View are fed from Allandale, where the power transformers are owned by Eskom (TimesLIVE, Oct 2026), and residents in Blue Hills have been told their supply comes from Eskom, not City Power (Midrand Reporter). Who bills you decides which SSEG registration you need, so we check your account first.
Could the City Power and Eskom debt dispute affect Midrand?
It has come close. In May 2026 Eskom published a notice listing four substations it could interrupt over the City of Johannesburg's debt, including Allandale, which supplies Midrand (Engineering News, May 2026). A battery-backed system protects you whatever happens between the two utilities.
Does hail affect solar panels in Midrand?
Midrand sits in one of Gauteng's worst hail belts. The November 2023 storm that lashed Midrand, Kyalami and Waterfall caused heavy property damage (The Citizen, Nov 2023), and Greenstone Hill was hit again in December 2025 (YFM). We install tier-1 panels and tell you exactly what to declare to your insurer.
Areas we cover in and around Midrand
Solar installation services in Midrand
Midrand on the map
Solar in Midrand: common questions
Do you install in Midrand estates like Kyalami Estate and Waterfall?
Yes. Estates usually need HOA approval for panel placement and sometimes inverter location. We prepare the layout and equipment details for the approval.
Do I need City Power approval before installing solar?
Yes. City Power requires SSEG approval before installation for grid-tied systems, with a CoC and proof of a registered electrical contractor. We submit it for you.
Can I keep my prepaid meter in Midrand if I install solar?
If you are a City Power customer and register a grid-tied system, City Power moves SSEG customers to a postpaid meter. Off-grid systems are treated differently; we explain the options at the assessment.
How far is Midrand from your team?
Midrand is between our Pretoria base and Johannesburg, so it is well within our normal service area.
We also install solar in
Ready to go solar in Midrand?
Tell us your suburb and roughly what you spend on electricity. We will come back with the right size and a price.
Page last updated 12 November 2026.
